WORK

Kitchen

YEAR

2025

INGLEWOOD

INGLEWOOD KITCHEN RENOVATION

Project Overview

This Inglewood kitchen renovation turned a 1994 closed-in U-shaped kitchen and a separate dining room into one open, hard-working kitchen. We removed the wall between the two rooms and carried the load on a new LVL beam. The new space holds a full-size island, a relocated range wall and a tall pantry wall. Both beams are wrapped in white oak veneer to match the cabinetry, so the structure reads as a design feature.

The finishes mix three cabinet colours: rift-cut white oak lowers, soft grey uppers and a deep teal island. A custom range hood clad in gilt aluminum sits against a hand-finished basketweave tile wall that runs from counter to ceiling. Beside the island, a coffee and wine bar disappears behind pocket doors when it’s not in use. New luxury vinyl plank runs through the kitchen, living room, mudroom and stairs.

Key Features

  • Wall between the kitchen and dining room removed, with a new LVL beam
  • Both ceiling beams clad in white oak veneer to match the cabinets
  • Rift-cut white oak slim shaker lowers, Benjamin Moore Distant Gray uppers and a Sherwin-Williams Moscow Midnight island
  • Custom range hood in Chemetal gilt aluminum laminate with a 42″ insert
  • Hidden coffee and wine bar with pocket doors, a wine rack, lit floating shelves and a beverage centre
  • Island with seating for three and a quartz top with dramatic veining
  • Long quartz peninsula with seating, open to the living room
  • Built-in microwave drawer in the peninsula
  • Workstation sink with a built-in cutting board
  • Porcelain tile in a basketweave pattern from counter to ceiling, with brass and matte black hardware
  • Floating oak shelves with integrated LED lighting
  • Poly-B water lines replaced during construction
  • New LVP flooring across the main floor and on the mudroom stairs

The Transformation

Before/After Slider

Inglewood kitchen before renovation with white cabinets and granite counters Inglewood kitchen renovation with white oak peninsula, teal island and black pendants

Before Photos

Inglewood kitchen before renovation with white cabinets and granite counters
Raised kitchen bar and dark beam seen from the family room before renovation
Kitchen sink and raised bar before renovation, open to the family room
Before kitchen with area for built in coffee bar

After Photos

SEE & HEAR WHAT OUR CLIENTS ARE SAYING.

HOW OUR HOME RENOVATION PROCESS WORKS

GET ACQUAINTED WITH US.

Book your first call with us for a quick and easy initial conversation about what you’re dreaming of for your home renovation project.

This is a great opportunity to determine if Rusch Design Build is a good fit for the type and size of renovation. Ask us any questions about our previous projects and experience, and we’ll start to put together some working numbers to give you an idea of budget range.

Next, we’ll schedule a free in-home consultation, where a team member from Rusch Design Build meets with you in your space to discuss your project in more depth, and gain an understanding of your goals and vision.

You’ll have a more accurate picture of budget and scope of project as a takeaway from this meeting.

PLANNING FOR SUCCESS.

You will be introduced to your design team, selected for your unique project needs, who will meet with in you in your space to explore your wishes, wants, and needs, and discuss how this will affect budget and scheduling for the project. From here our team will work on preparing initial schematics for the space that you envision, while ensuring the proper engineering and building code needs are met.

Review the space in-person with your design team
Discuss the idea collection as per your lists and define goals
Take before photos
Measure the existing space
Prepare, review u0026amp; finalize schematic drawings and budget (2 revisions)
Host initial review of the project with relevant trades

THE MAGIC OF CREATION.

After identifying what you like, what works, and what doesn’t in the preliminary schematic drawings and estimate, our design team will further develop the drawings and prepare an estimate based on your feedback.

Prepare design/development drawings (scaled drawings of approved schematic design + critical elevations) (2 revisions) 
Choose selections for all finishes and fixtures
Prepare elevations and 2D drawings for scope
Prepare written scope of work
Prepare lighting and electrical design and layout
Prepare intermediate estimate of construction costs
Review with client design development drawings and estimate

DETAILS, DETAILS, DETAILS.

Your design decisions will have an impact on many elements and will help us in fine tuning the design and costing of your project. You will be introduced to your Project Manager and do a walk-through of your home prior to finalizing and approving your complete budget, drawings and selections. 

Complete forensic inspection to identify structural, mechanical and/or electrical engineering services
Prepare construction drawings to obtain a building permit
Arrange structural engineering review if required 
Prepare construction specifications and contract
Approve schedule and final construction costs
Building permit application

OFF TO WORK WE GO!

Building commences! Your project begins!

We take care to protect your space and keep things tidy and contained during your renovation. We utilize dust-control barriers and will set up any safety measures before demolition or a hammer is swung. Our team conducts an end-of-day tidy every day.

We will handle permits, inspections, and code compliance for a safe, legal, future-proof renovation.

You’ll have a single point of contact, your Project Manager, who will remain in constant contact with you to communicate regular updates on what has happened, what is happening now, and what to expect next – every step of the way. You can expect transparency and dependability throughout the project, to be delivered on schedule, in budget and quality that lasts,

ENJOY YOUR NEW SPACE.

Your contract completion date will mark the final team meeting. We will guide you and your family through the finished result, explaining exactly what was done, how everything operates, and any required maintenance.

We’ll check in 30 days later, and again at 1-2 months to confirm that everything is still entirely to your satisfaction.

If any issues or concerns arise throughout the length of your 5-year warranty or beyond, we’re always just a phone call away. Our Service Department is available for any support you may require; all you have to do is relax and enjoy your new space!

Renovation Goals

The original kitchen was a tight U-shape, cut off from the dining room by a wall and a closet. White cabinets, speckled granite and a raised bar made the room feel dated, and the layout left little prep space or storage. The homeowners wanted one open space for cooking and entertaining, with room for an island and a proper spot for coffee and wine.

  • Open the kitchen to the dining area and living room
  • Add an island with seating and more prep space
  • Gain tall pantry storage and a dedicated coffee and wine station
  • Keep and reuse their Viking range in a better location
  • Replace the raised bar with a counter-height peninsula
  • Replace the old Poly-B water lines while the walls were open
  • Run new flooring through the main floor

The key challenge was making room for an island in a narrow inner-city home. The solution was to remove the kitchen–dining wall, support the opening with a new LVL beam, and move the range, sink and fridge into the old dining room area. That freed up the middle of the room for the island.

Vision

Design Phase

The original main floor separated a U-shaped kitchen from the dining room with a wall and a closet, so the kitchen felt cramped and closed off. The new plan removes that wall and carries the load on a new LVL beam. The range and a tall pantry wall move into the former dining area, and a central island with seating fills the middle. A counter-height peninsula opens the kitchen to the living room, and a hidden coffee bar sits where the closet used to be.

Old Floor Plan

before floor layout for a renovation in Inglewood calgary

New Floor Plan

After floorplan for a kitchen renovation in inglewood

3D renderings let the homeowners see the open layout, the oak-clad beams, the island and the hidden coffee bar before construction started. Seeing the space in 3D helped them confirm the layout, cabinet colours and finishes with confidence. That clarity supported accurate pricing and kept decisions to a minimum during the build.

Kitchen 3D

inglewood kitchen renovation 3d render cabinetry

Coffee Bar 3D Render

inglewood renovation coffee bar 3d render

READY TO START YOUR FREE CONSULTATION?

Book below or call us at 403.457.2950 to claim your free consultation.

Construction Phase

Construction started on January 13, 2025, and finished on April 11, 2025, about 13 weeks from demolition to final walkthrough. Our team removed the kitchen–dining wall, installed the new LVL beam, and wrapped both beams in oak veneer. We opened the floor to move the sink drain, water lines and gas line, rerouted the hood fan venting and moved the return air into the island toe kick. While the walls were open, we replaced the home’s Poly-B water lines to the bathrooms, laundry and mechanical room. New electrical included pot lights, under-cabinet lighting, dimmers and a 20 amp outlet with automatic shutoff for the coffee bar. The ceiling got a new knockdown texture, and LVP flooring finished the main floor.

Project Facts
NeighbourhoodInglewood, SE Calgary
Home built1994
ScopeKitchen, coffee bar, main floor flooring, Poly-B replacement
TimelineJanuary 13 – April 11, 2025 (about 13 weeks)
HighlightsWall removed with new LVL beam, hidden coffee bar, custom gilt hood

READY TO START YOUR FREE CONSULTATION?

Book below or call us at 403.457.2950 to claim your free consultation.

SCHEDULE A CALL – REQUEST AN ESTIMATE