Calgary Home Additions

Additions

BOOK A FREE 15-MIN CONSULT SEE OUR WORK

Award-Winning Calgary Addition Contractors

Calgary home additions that fit your lot, your house, and how you live.

Home additions Calgary, designed and built by one team

Some houses are in the right neighbourhood, on the right street, with the wrong amount of space. Moving solves that. So does building.

An addition adds square footage to the house you already have — a small bump-out for the few feet a kitchen or entry was always missing, or close to doubling the size of the home. As a house addition contractor, Rusch has built a lot of them over the years: removing roofs, front bump-outs, side bump-outs, house additions with basements and without. The design and the construction come from the same team, which matters more on an addition than on almost any other project, because you are cutting into a house that already exists and the drawings have to survive contact with what is behind the walls.

Family-owned, Calgary, since 2003.

Build up, or build out?

This is the first real decision, and the lot usually settles it rather than preference.

Home additions Calgary framed up
OPTION ONE

Building up

A storey over the existing footprint. Leaves the yard intact and is often the only option on a narrow inner-city lot. The question is whether the existing foundation and walls can carry the load — a structural assessment, not a guess, and it happens before anything is drawn.

OPTION TWO

Building out

Extending at ground level. Avoids the structural question but spends yard, and runs into parcel coverage limits and setbacks. In R-C1 the City caps coverage at 45%, rear setbacks start at 7.5 m and laned side setbacks at 1.2 m. On a tight lot, building out can be impossible before it is ever a design question.

Most of deciding is measurement. We look at the lot, the land use district, the foundation and the roof line, and tell you which direction is actually available — including when the answer is that an addition is the wrong direction and reconfiguring the space you already have will do more. We would rather say that in week one than in month four.

Our company specializes in home additions to create the space you need without moving.

A closer look: the Oakridge rear-yard kitchen addition

Oakmount Revival is a full-home renovation in Oakridge that took a three-storey family home close to studs and rebuilt it. The piece most relevant here is the rear-yard kitchen addition: the kitchen pushed out into the back yard, which is what made the oversized island, the walk-through butler’s pantry and the wall of windows possible. The room did not simply get new finishes — it got more floor and a new outside edge.

Oakridge kitchen before the rear addition
Before: the original kitchen, inside the old footprint.
Oakridge kitchen after the rear-yard addition
After: the rear-yard addition gave the kitchen a new outside edge.

Screw piles: sometimes the faster, cheaper foundation

Many Calgary home additions do not need a full concrete foundation. On the right site, screw piles can support an addition with less excavation, which can save both time and money. They are not right for every project — soil, loads and the design all decide it — but they are worth asking about early, because the foundation approach is settled long before anyone picks a finish.

This is the kind of thing that usually surfaces too late, after a homeowner has already budgeted for the more expensive option. We raise it during design, when it can still change the number.

Permits for a house addition in Calgary

Home addition drawings for a Calgary permit application
Addition drawings of the kind submitted with a Calgary permit application.
ALWAYS REQUIRED

Building permit

Every addition needs one. The City counts anything that increases your home’s area — including covered decks, porches, attached garages and sunrooms. Electrical and plumbing carry their own permits. Review time is roughly seven days.

SOMETIMES REQUIRED

Development permit

Needed only if the design or its location does not meet the Land Use Bylaw. If your addition fits the rules, you do not need one.

THE REAL COST

10 to 12 weeks

The development permit timeline, including a 60-day decision period and a 21-day advertisement and appeal period. A design that quietly needs one can add two to three months before a shovel moves. We handle the applications.

Figures are the City of Calgary’s own and are approximate, not guaranteed. Building permits expire 180 days from issuance. Confirm current requirements for your parcel — bylaws change.

What a Calgary home addition costs

A home addition is not priced by square foot alone, and anyone who quotes you one over the phone is guessing. There are almost always structural elements that have to be carried in both the design and the cost. What moves the number:

Foundation and structural work — usually the largest single variable
How much of the existing house you touch — rerouting mechanical, electrical and plumbing
The tie-in — roof lines, exterior materials and floor levels reading as one house
Permits and the approval path
Finish level — the part most homeowners think of first, and rarely the largest line

We give you a real number after we have looked at the house, not before. If you would rather see how we arrive at what your addition cost in Clagary, book a Call.

Design first, then build

plot layout for a new addition to existing home

We draw the addition before we price the construction, and we do both. You see the plans and 3D views of how the new space meets the old one — floor levels, sightlines, where the light lands — and you make the expensive decisions on paper, where changing your mind costs a revision instead of a tear-out.

That sequence is why our timelines and costs hold. When the designer and the builder are the same company, nobody hands you drawings that turn out to be unbuildable at the price they were designed to.

Living in your home during an addition

Interior demolition before a Calgary home addition, walls opened to the studs

Before construction begins, we’ll walk you through what to expect, including whether you can remain in your home during the renovation and when you may need to move out temporarily. This depends on the type and scope of the addition, but we’ll identify these periods during planning so you can make arrangements well in advance.

Utility shut-offs get scheduled and communicated in advance. The work zone stays sealed. The site gets cleaned.

RUSCH DESIGN BUILD

AN AWARD-WINNING RENOVATION PROCESS

No matter how big your project may be, our team is committed to your vision and needs. Our fully in-house team allows us to give your renovation our full attention to every detail, from start to finish, creating high quality work that lasts a lifetime.

Rusch Design Build delivers a thoughtful, systemized approach to every project, which keeps us on budget and on schedule – and in constant communication between teams – so that nothing is overlooked, and there are no surprises. We developed our process over the 20+ years we’ve been renovating homes in Calgary – and our many beautiful projects and happy clients are proof that our process works!

SEE & HEAR WHAT OUR CLIENTS ARE SAYING.

An addition is often one piece of a larger plan

Whole-home renovations

If you are rethinking the house as a whole, the addition is one part of that project, not a separate one.

Kitchen renovations

Rear additions and kitchens are frequently the same job, as Oakridge was.

Interior design

Design and build from the same team, not handed off mid-project.

Home addition FAQs

READY TO START YOUR FREE CONSULTATION?

Click below or call us at 403.457.2950 to claim your free consultation.

SCHEDULE A CALL – REQUEST AN ESTIMATE

RUSCH DESIGN BUILD

FIND US

Get in Touch

REACH US HERE

3612 Burnsland Road SE Calgary, AB T2G 3Z2
+1 403 457-2950
info@ruschdesignbuild.com

Got a Question?

SEND US A MESSAGE

This field is required.
This field is required.
This field is required.
This field is required.