WORK

Second Floor & Bathrooms

YEAR

2025

WOODBINE

WOODBINE RENOVATION

Project Overview

This Woodbine second floor renovation transformed the entire second floor of a 1984 two-storey family home: three bedrooms and two bathrooms. The original ensuite had carpet underfoot, a raised corner tub with carpeted steps, oak vanities under fluorescent light boxes, and a cramped stall shower that opened straight and a dark, narrow stall shower. We reconfigured it into a calm, spa-like retreat: a freestanding tub set between the corner windows against handmade-look teal tile, two wall-hung stained maple vanities with toe-kick lighting, and a large-format porcelain walk-in shower behind frameless glass. The main bathroom, with its 1970s brown tile, patterned vinyl and a shower that no longer worked, was rebuilt with a grey shaker vanity, dark stone-look porcelain, a new tub and a separate glass shower. New smooth ceilings, carpet, doors, trim, lighting and custom built-ins finished the rest of the floor.

“The project was on budget with no extra cost surprises. Our upstairs is transformed from a space that was not functional to one that we love to be in.” — Homeowners, Woodbine

Key Features

  • Freestanding Duravit tub with a floor-mounted filler and hand shower, set between the corner windows
  • Glossy teal vertical-stack tile wrapping the tub corner
  • Two wall-hung stained maple shaker vanities with quartz tops, Kohler sinks and Castia faucets
  • Toe-kick LED lighting under the vanities
  • Arched bevelled mirrors and matching stained maple floating shelves
  • Reconfigured walk-in shower in large-format travertine-look porcelain with frameless 10mm glass and a linear niche
  • Kohler Anthem digital shower controls with a rainshower head and slide-bar hand shower
  • Main bath with a grey painted shaker vanity, quartz top, full-width mirror and toe-kick lighting
  • Dark stone-look porcelain around a new Duravit alcove tub with a wall-mounted Castia filler
  • Separate glass shower and pocket-door toilet room in the main bath
  • Rigid-core LVP in both bathrooms and the primary walk-in closet
  • New custom oak bookcase at the upstairs landing
  • New built-in cabinetry with under-cabinet lighting in one of the bedrooms
  • New closet organizers in the walk-in closet
  • Popcorn ceilings across the second floor covered and finished smooth
  • 11 new LED pot lights, 4 new bath fans and dimmers throughout
  • New carpet on the upper floor and stairs, new doors, baseboards and casings
  • Existing oak stair railing refinished

The Transformation

Before/After Slider

Woodbine ensuite before renovation with carpeted corner tub deck Woodbine ensuite after renovation with freestanding tub and maple vanities

Before Photos

Before photo of a older bathroom with carpet flooring
before photo 80's bathroom with vinyl floor
before photo of halway, bookcase and railings
Before photo of ensuite renovation for woodbine reno
Before photo of woodbine bathroom ensuite with carpet

After Photos

SEE & HEAR WHAT OUR CLIENTS ARE SAYING.

“Rusch Design Build completed a full renovation of our upstairs (3 bedrooms, 2 bathrooms) in the spring of 2025. The design and construction teams listened closely to our needs, provided excellent guidance and were spot on with recommendations and cost estimates. From the first meeting to project completion, the designers, suppliers, trades, project managers and sub-contractors were excellent at their jobs and very respectful of us and our home.

Renovations can be disruptive but the pre-construction project timeline was a huge asset, both for ongoing communication and to help us schedule our daily lives amid the construction. The team also worked with us when there were changes that came up and when we had an unexpected delay on our side. The project was on budget with no extra cost surprises. Our upstairs is transformed from a space that was not functional to one that we love to be in. We highly recommend Rusch for any design/build project you may have.”

— Homeowners, Woodbine ★★★★★ Google review

HOW OUR HOME RENOVATION PROCESS WORKS

GET ACQUAINTED WITH US.

Book your first call with us for a quick and easy initial conversation about what you’re dreaming of for your home renovation project.

This is a great opportunity to determine if Rusch Design Build is a good fit for the type and size of renovation. Ask us any questions about our previous projects and experience, and we’ll start to put together some working numbers to give you an idea of budget range.

Next, we’ll schedule a free in-home consultation, where a team member from Rusch Design Build meets with you in your space to discuss your project in more depth, and gain an understanding of your goals and vision.

You’ll have a more accurate picture of budget and scope of project as a takeaway from this meeting.

PLANNING FOR SUCCESS.

You will be introduced to your design team, selected for your unique project needs, who will meet with in you in your space to explore your wishes, wants, and needs, and discuss how this will affect budget and scheduling for the project. From here our team will work on preparing initial schematics for the space that you envision, while ensuring the proper engineering and building code needs are met.

Review the space in-person with your design team
Discuss the idea collection as per your lists and define goals
Take before photos
Measure the existing space
Prepare, review u0026amp; finalize schematic drawings and budget (2 revisions)
Host initial review of the project with relevant trades

THE MAGIC OF CREATION.

After identifying what you like, what works, and what doesn’t in the preliminary schematic drawings and estimate, our design team will further develop the drawings and prepare an estimate based on your feedback.

Prepare design/development drawings (scaled drawings of approved schematic design + critical elevations) (2 revisions) 
Choose selections for all finishes and fixtures
Prepare elevations and 2D drawings for scope
Prepare written scope of work
Prepare lighting and electrical design and layout
Prepare intermediate estimate of construction costs
Review with client design development drawings and estimate

DETAILS, DETAILS, DETAILS.

Your design decisions will have an impact on many elements and will help us in fine tuning the design and costing of your project. You will be introduced to your Project Manager and do a walk-through of your home prior to finalizing and approving your complete budget, drawings and selections. 

Complete forensic inspection to identify structural, mechanical and/or electrical engineering services
Prepare construction drawings to obtain a building permit
Arrange structural engineering review if required 
Prepare construction specifications and contract
Approve schedule and final construction costs
Building permit application

OFF TO WORK WE GO!

Building commences! Your project begins!

We take care to protect your space and keep things tidy and contained during your renovation. We utilize dust-control barriers and will set up any safety measures before demolition or a hammer is swung. Our team conducts an end-of-day tidy every day.

We will handle permits, inspections, and code compliance for a safe, legal, future-proof renovation.

You’ll have a single point of contact, your Project Manager, who will remain in constant contact with you to communicate regular updates on what has happened, what is happening now, and what to expect next – every step of the way. You can expect transparency and dependability throughout the project, to be delivered on schedule, in budget and quality that lasts,

ENJOY YOUR NEW SPACE.

Your contract completion date will mark the final team meeting. We will guide you and your family through the finished result, explaining exactly what was done, how everything operates, and any required maintenance.

We’ll check in 30 days later, and again at 1-2 months to confirm that everything is still entirely to your satisfaction.

If any issues or concerns arise throughout the length of your 5-year warranty or beyond, we’re always just a phone call away. Our Service Department is available for any support you may require; all you have to do is relax and enjoy your new space!

Renovation Goals

The second floor had remained largely unchanged since the home was built in 1984. The ensuite featured carpet in a wet area, a bulky tub deck that dominated the space, and a dark, cramped shower that lacked functionality. The main bathroom was equally dated, with brown tile, a cultured-marble vanity, and a shower that was no longer working. Throughout the floor, popcorn ceilings, worn carpeting, and dark wood trim contributed to an outdated, heavy feel, with a layout that no longer met the homeowners’ needs..

  • Turn the ensuite into a bright, spa-like primary bathroom
  • Reconfigure the shower as a proper walk-in shower within the ensuite
  • Give each person their own vanity and storage
  • Rebuild the main bath with durable, easy-to-clean finishes
  • Replace popcorn ceilings, carpet, doors and trim across the floor
  • Add built-in storage on the landing and in the bedroom
  • Improve lighting and ventilation in both bathrooms

The key challenge in this Woodbine renovation was reconfiguring the ensuite. Removing the raised tub deck and reworking the walls around the old stall shower freed space for a freestanding tub and a full walk-in shower. That meant moving the tub drain and water lines, levelling the subfloor and replumbing for two wall-hung vanities.

Vision

Design Phase

The original second floor had an ensuite built around a raised, carpeted corner tub, with oak vanities on each side, a separate toilet room and a small, dark, narrow stall shower. The main bathroom was split into a vanity area and a separate tub and shower room, all finished in dated tile, vinyl and carpet. The new plan reworks the ensuite walls so a freestanding tub sits between the corner windows, flanked by two wall-hung vanities, with a larger, brighter walk-in shower beside the walk-in closet. The main bathroom keeps its footprint but gains a new vanity, a tiled tub, a separate glass shower and a pocket-door toilet room, while new built-ins add storage at the landing and in one of the bedrooms.

Old Floor Plan

Woodbine before layout of second floor reno

New Floor Plan

After layout for woodbine second floor reno

Detailed 3D renderings let the homeowners see the new ensuite before construction began: the freestanding tub between the windows, the wall-hung vanities on each side, and the walk-in shower in large-format porcelain. A rendering of the main bath confirmed the vanity, tile and layout. Seeing both rooms early locked in proportions and finishes, which is a big part of why the project stayed on budget.

Ensuite 3D Render

3d Render of corner bathtub with vanities for woodbine reno

Fireplace 3D Render

main bath 3d render for woodbine reno

READY TO START YOUR FREE CONSULTATION?

Book below or call us at 403.457.2950 to claim your free consultation.

Construction Phase

Construction started on March 24, 2025, and finished on June 27, 2025, about 14 weeks from demolition to final walkthrough, under a City of Calgary building permit with inspected electrical. A detailed pre-construction timeline let the homeowners plan their daily lives around the work. Our team removed the carpeted tub deck, old vanities, stall shower and dated tile, then framed the new bathroom layouts and levelled the ensuite subfloor. We moved the tub drain and water lines for the freestanding tub, plumbed two wall-hung vanities and new shower valves, and installed four new bath fans vented through the roof. Both bathrooms were waterproofed with Schluter board, then tiled and fitted with frameless 10mm glass showers.

Across the second floor, the popcorn ceilings were covered with new drywall and finished to a smooth Level 5 coat. New electrical included 11 LED pot lights, toe-kick vanity lighting, dimmers and new smoke detectors. We installed the new landing bookcase and bedroom built-in, new doors, baseboards, casings, closet organizers and carpet on the upper floor and stairs, and refinished the existing oak stair railing.

Project Facts
NeighbourhoodWoodbine, SW Calgary
Home1984 two-storey
ScopePrimary ensuite, walk-in closet, main bathroom, 3 bedrooms, landing, stairs
TimelineMarch 24 – June 27, 2025 (about 14 weeks)
PermitsCity of Calgary building permit
HighlightsFreestanding tub, walk-in shower with digital controls, wall-hung maple vanities, smooth ceilings, custom built-ins

READY TO START YOUR FREE CONSULTATION?

Book below or call us at 403.457.2950 to claim your free consultation.

SCHEDULE A CALL – REQUEST AN ESTIMATE