WORK

Main Floor Renovation

VIDEOS

Instagram

YEAR

2025

SCENIC ACRES

SCENIC ACRES RENOVATION

Project Overview

This Scenic Acres renovation started with a practical need, replacing the home’s original Poly-B plumbing, and grew into the main floor renovation the family had wanted for years. We reworked the main floor of their 1990s two-storey home, from the kitchen and family room to the laundry and powder room.

The original kitchen had honey oak cabinets, laminate counters, a small island and an angled corner pantry that wasted space. We rebuilt it around a full wall of tall storage, a built-in oven tower and a hidden butler’s pantry built out into the old dining area, with a long quartz peninsula connecting the kitchen to the dining nook and family room. In the family room, a new gas fireplace sits in a floor-to-ceiling porcelain feature wall with black built-ins. A refreshed laundry room, a new powder room vanity and continuous LVT flooring complete the main floor.

“They brought our 1990s styled home into a modern, updated, cosy place we love.” — T & S, Scenic Acres

Key Features

  • Two-tone shaker cabinetry in Cloverdale Blue Depths (lowers and tall wall) and Sherwin-Williams Repose Grey (uppers)
  • Hidden butler’s pantry behind a panelled door that matches the cabinetry
  • Built-in double wall ovens and a recessed French-door fridge
  • Induction cooktop and chimney hood with glossy herringbone tile to the ceiling
  • Baystone Thunder quartz counters with a long seating peninsula
  • Floating maple shelves with integrated LED lighting
  • Wine and display cabinets over a honed Venetian Blue marble picket backsplash
  • New gas fireplace in a floor-to-ceiling porcelain surround with Iron Ore built-ins, LED niches and surround sound
  • Laundry room with a folding counter, tall storage and a hanging rod
  • Original Poly-B plumbing replaced during construction
  • New barrel arch, LVT flooring throughout, new baseboards and casings

The Transformation

Before/After Slider

Before photo kitchen After Photo Kitchen

Before Photos

Before photo of 90's Kitchen
Before photo of dated kitchen
Before Photo of old laundry room
Before photo of old living room and fireplace
Before photo of Dated kitchen and corner pantry

After Photos

SEE & HEAR WHAT OUR CLIENTS ARE SAYING.

We started our journey by needing to replace our ‘poly b’ and do some long overdue renovations. We interviewed builders and decided to place our trust in Rusch. From day 1 they clearly outlined the process and met our expectations all along the way. The design process created a main floor with a kitchen and family room beyond our wildest dreams. We worked through creative ideas with Tawnya, Oliver and Aldrin. They incorporated our ideas and we were frequently told ‘of course you can do that’. They brought our 1990s styled home into a modern, updated, cosy place we love. During the construction phase we were given weekly updates by our project managers Brad and Brennan. Unexpected issues were dealt with calmly and with ongoing conversations. The trades people were friendly, professional and treated our home with respect. The finished product has created a home we are proud of and are excited to share with family and friends.”

— T & S, Scenic Acres ★★★★★ Google review

HOW OUR HOME RENOVATION PROCESS WORKS

GET ACQUAINTED WITH US.

Book your first call with us for a quick and easy initial conversation about what you’re dreaming of for your home renovation project.

This is a great opportunity to determine if Rusch Design Build is a good fit for the type and size of renovation. Ask us any questions about our previous projects and experience, and we’ll start to put together some working numbers to give you an idea of budget range.

Next, we’ll schedule a free in-home consultation, where a team member from Rusch Design Build meets with you in your space to discuss your project in more depth, and gain an understanding of your goals and vision.

You’ll have a more accurate picture of budget and scope of project as a takeaway from this meeting.

PLANNING FOR SUCCESS.

You will be introduced to your design team, selected for your unique project needs, who will meet with in you in your space to explore your wishes, wants, and needs, and discuss how this will affect budget and scheduling for the project. From here our team will work on preparing initial schematics for the space that you envision, while ensuring the proper engineering and building code needs are met.

Review the space in-person with your design team
Discuss the idea collection as per your lists and define goals
Take before photos
Measure the existing space
Prepare, review u0026amp; finalize schematic drawings and budget (2 revisions)
Host initial review of the project with relevant trades

THE MAGIC OF CREATION.

After identifying what you like, what works, and what doesn’t in the preliminary schematic drawings and estimate, our design team will further develop the drawings and prepare an estimate based on your feedback.

Prepare design/development drawings (scaled drawings of approved schematic design + critical elevations) (2 revisions) 
Choose selections for all finishes and fixtures
Prepare elevations and 2D drawings for scope
Prepare written scope of work
Prepare lighting and electrical design and layout
Prepare intermediate estimate of construction costs
Review with client design development drawings and estimate

DETAILS, DETAILS, DETAILS.

Your design decisions will have an impact on many elements and will help us in fine tuning the design and costing of your project. You will be introduced to your Project Manager and do a walk-through of your home prior to finalizing and approving your complete budget, drawings and selections. 

Complete forensic inspection to identify structural, mechanical and/or electrical engineering services
Prepare construction drawings to obtain a building permit
Arrange structural engineering review if required 
Prepare construction specifications and contract
Approve schedule and final construction costs
Building permit application

OFF TO WORK WE GO!

Building commences! Your project begins!

We take care to protect your space and keep things tidy and contained during your renovation. We utilize dust-control barriers and will set up any safety measures before demolition or a hammer is swung. Our team conducts an end-of-day tidy every day.

We will handle permits, inspections, and code compliance for a safe, legal, future-proof renovation.

You’ll have a single point of contact, your Project Manager, who will remain in constant contact with you to communicate regular updates on what has happened, what is happening now, and what to expect next – every step of the way. You can expect transparency and dependability throughout the project, to be delivered on schedule, in budget and quality that lasts,

ENJOY YOUR NEW SPACE.

Your contract completion date will mark the final team meeting. We will guide you and your family through the finished result, explaining exactly what was done, how everything operates, and any required maintenance.

We’ll check in 30 days later, and again at 1-2 months to confirm that everything is still entirely to your satisfaction.

If any issues or concerns arise throughout the length of your 5-year warranty or beyond, we’re always just a phone call away. Our Service Department is available for any support you may require; all you have to do is relax and enjoy your new space!

Renovation Goals

The project began with replacing the home’s original Poly-B plumbing, and it was the right time to fix everything else that wasn’t working. The main floor hadn’t changed since the house was built. Oak cabinets, laminate counters and white appliances felt dated, and the layout worked against the family. An angled corner pantry ate floor space, the small island offered little prep room, and a built-in desk had become a catch-all for mail and clutter. The family room had wall-to-wall carpet and a plain fireplace, and the laundry room had no counter and almost no storage.

  • Replace the original Poly-B plumbing
  • Modernize the kitchen with a bold, personal colour palette
  • Gain real storage, including a proper walk-in pantry
  • Add counter space and seating while opening the kitchen to the family room
  • Give the family room a focal point for TV, fireplace and media
  • Make the laundry room work, with folding, hanging and storage space
  • Replace carpet and vinyl with durable flooring across the main floor

The key challenge in this Scenic Acres renovation was finding room for a larger pantry without shrinking the kitchen. The solution was to remove the angled corner pantry, build a new butler’s pantry out into the old dining area, and close it off behind a hidden door in the new cabinetry wall.

Vision

Design Phase

The original main floor separated the kitchen from the dining area with an angled corner pantry and French doors, and a built-in desk took up valuable wall space. The new plan pushes a butler’s pantry into the old dining area, lines the kitchen with a full-height storage wall, and opens the kitchen to the family room with a long seating peninsula.

Old Floor Plan

Before Floor plan of a residential layout

New Floor Plan

Architectural main floor plan layout

Detailed 3D renderings let the homeowners compare design directions before anything was ordered. One option explored warm wood lowers and a dramatic veined quartz. The chosen design paired blue and grey shaker cabinetry with herringbone tile, and it is very close to the finished kitchen. That early clarity supported accurate pricing and fewer decisions during construction.

Kitchen 3D Render

3D rendering of the proposed Scenic Acres kitchen with blue and grey shaker cabinetry

Fireplace 3D Render

3D render of living room fireplace and cabinetry

READY TO START YOUR FREE CONSULTATION?

Book below or call us at 403.457.2950 to claim your free consultation.

Construction Phase

Construction started on July 15, 2025, and finished on November 3, 2025, about 16 weeks from demolition to final walkthrough. Our in-house team handled demolition and framing for the new butler’s pantry and fireplace wall, closed off the old doorway, and built the new barrel arch. New plumbing and electrical went in for the kitchen, laundry and powder room, and the range hood was vented to the exterior. We also opened access to replace the home’s original Poly-B plumbing, a known failure risk in Calgary homes of this era, giving the family peace of mind behind the new finishes. Cabinetry, tile, flooring, lighting and finishing were coordinated in sequence so the main floor came together cleanly, down to the LED strips tucked under the floating shelves.

Throughout construction, the homeowners received weekly updates from their project managers, and unexpected issues were worked through together.

ScopeKitchen, butler’s pantry, family room, laundry, powder room
TimelineJuly 15 – November 3, 2025 (about 16 weeks)
HighlightsHidden butler’s pantry, gas fireplace feature wall, Poly-B replacement

READY TO START YOUR FREE CONSULTATION?

Book below or call us at 403.457.2950 to claim your free consultation.

SCHEDULE A CALL – REQUEST AN ESTIMATE